EterShieldDocs
etershield.com
PTLog in
Guide/People and quality

Quality Management (ISO 9001)

The Quality Management module supports the requirements of ISO 9001:2015, covering the core processes of a Quality Management System (QMS).

Go to Menu → Quality.

29.1 Document Control

Repository of QMS documents with a controlled lifecycle.

Field Description
Title and version Unique identification of the document
Type Procedure, Work Instruction, Record, Policy
Status Draft → Under Review → Active → Obsolete
Approver Person responsible for formal approval
Review cycle Frequency in months (e.g. 12 months)
Next review Automatically calculated date

Active documents with an overdue review generate alerts on the dashboard. Obsolete documents are archived and do not appear in searches by default.

Go to Document Control.

29.2 Customer Complaints and CAPA

Recording and handling of customer complaints with root cause analysis and a corrective action plan.

Complaint flow:

  1. Receipt: channel (email, phone, portal), customer, description of the problem
  2. Analysis: category, severity, root cause identified
  3. Action Plan: corrective actions with owner and deadline
  4. Verification: confirmation of effectiveness after implementation
  5. Closure: Closed status with resolution date

Go to CAPA Complaints.

29.3 Equipment Calibration

Management of the calibration schedule for equipment and measuring instruments.

Each record includes:

  • Equipment and serial number
  • Date of last calibration and calibrating body
  • Date of next calibration (calculated from the interval)
  • Result (Pass / Fail / Out of Service)
  • Calibration certificate (upload)

Equipment with overdue calibration or calibration expiring within 30 days is highlighted on the dashboard. The system generates automatic tasks for the owner.

Go to Calibration.

29.4 Supplier Audits

Programme of ISO 9001 audits of critical suppliers, with a compliance checklist.

Each audit records:

  • Supplier audited and scope (products/services covered)
  • Date and audit team
  • Compliance checklist against ISO 9001 requirements (by clause)
  • Non-conformities identified and action plan
  • Status (Planned / In Progress / Completed)
  • Compliance score (%)

Go to Supplier Audits.

29.5 SPC Control Charts

Statistical Process Control: statistical monitoring of processes to detect deviations.

Supported chart types:

Chart When to use
X-bar Control of the mean of a continuous process
R (Range) Control of the range (process variability)
p (Proportion) Control of the proportion of non-conformities

How to use:

  1. Create a chart for the process to monitor (e.g. delivery time, defect rate)
  2. Enter subgroups of measurements periodically
  3. The system automatically calculates the LCL, UCL and the centre line
  4. Points outside the control limits are flagged in red

Go to SPC Charts.

29.6 CAPA 8D

Corrective and Preventive Action, 8 Disciplines: a structured problem-solving methodology.

The 8 disciplines:

# Discipline Description
D1 Team Forming the multidisciplinary team
D2 Problem Detailed description of the problem
D3 Containment Immediate actions to limit the impact
D4 Root Cause Root cause analysis (5 Whys, Ishikawa)
D5 Corrective Actions Selection and planning of permanent actions
D6 Implementation Execution and validation of the actions
D7 Prevention Updating procedures and standards
D8 Closure Recognising the team and lessons learned

Each discipline has its own text field; the root cause (D4) and the preventive action (D7) are those of the CAPA itself.

Go to Quality (ISO 9001) (CAPA 8D tab) or to CAPA 8D.

EterShield, an Eter Growth platform